Under Spanish rules, the contracting shipper (cargador contractual) is whoever hires the actual carrier directly, and the actual carrier (transportista efectivo) is the holder of the transport authorisation used to physically perform the journey. These are the two parties that Orden FOM/2861/2012 requires to document every consignment, and so the two that appear in the DeCA (Spain's electronic administrative control document). When a factory hires a haulier there is no doubt. When an agency steps in or the job is subcontracted, the doubts begin.
This guide covers the definitions, several subcontracting chains, who is liable for each field and how the two copies and the one-year retention work. It applies to domestic transport in Spain and to cabotage by foreign hauliers.
What a contracting shipper is in the DeCA
Article 4 of Orden FOM/2861/2012 of 13 December defines the contracting shipper as the individual or company that contracts the carriage of the consignment directly with the actual carrier. The Order lists who it can be:
- the actual shipper, meaning whoever has the goods: a factory, a warehouse, a quarry;
- another haulier;
- a cooperative or a marketing company;
- a transport agency or a freight forwarder;
- a warehouse-distributor or a logistics operator;
- anyone else who regularly contracts transport or acts as an intermediary in contracting it.
To find the contracting shipper, it does not matter who owns, sends or receives the goods. There is only one question to ask: who contracts with the party that moves the truck?
What an actual carrier is
The actual carrier is the individual or company holding the transport authorisation under which the transport is physically carried out. Put simply, the company or owner-operator whose authorisation covers the truck carrying the load.
Three points that cause confusion:
- An employed driver is not the actual carrier. The company that employs the driver is.
- The driver's name is not a mandatory field in the goods control document, although it can be added.
- An agency with no trucks that subcontracts the journey is not the actual carrier for that consignment, even if it is the one invoicing the customer.
How to identify the contracting shipper when work is subcontracted
The rule works for any chain: look at the last link. The control document travels with the consignment, and the contracting shipper shown on it is whoever contracts with the party doing the journey. Four cases make it clear.
The factory hires the haulier directly
Cerámicas del Ebro (tax ID B00000000) hires Transportes Moncayo to carry floor tiles from Castellón to Getafe: 18,400 kg, tractor unit 4821 LKM and semi-trailer R-7745-BCX. There are no intermediaries. Cerámicas del Ebro is the contracting shipper and Transportes Moncayo is the actual carrier.
Factory, agency and owner-operator
Cerámicas del Ebro gives the same job to Logística Gállego, a transport agency in Zaragoza with no trucks of its own, which subcontracts it to Raúl Gimeno, an owner-operator with one tractor unit and his own authorisation. In the DeCA for that journey, the contracting shipper is Logística Gállego, because it contracts with the actual carrier, Raúl. Cerámicas del Ebro does not appear as contracting shipper, even though the goods leave from its loading bay. If the parties want it on record, it can go in the remarks.
One haulier subcontracts another
Transportes Moncayo accepts the Cerámicas del Ebro job, but has no free truck that day and subcontracts it to Transportes Huecha. For that consignment, Transportes Moncayo becomes the contracting shipper and Transportes Huecha the actual carrier. The same company can be the actual carrier in the morning and the contracting shipper in the afternoon, and its software should handle both.
A long chain with a logistics operator
A logistics operator manages all of Cerámicas del Ebro's distribution in central Spain, uses an agency for some routes, and the agency subcontracts an owner-operator. There are three contracts in a chain, but only one truck on the road. In the DeCA, the contracting shipper is the agency, because it contracts with the owner-operator.
| Contracting chain | Contracting shipper in the DeCA | Actual carrier |
|---|---|---|
| Cerámicas del Ebro → Transportes Moncayo | Cerámicas del Ebro | Transportes Moncayo |
| Cerámicas del Ebro → Logística Gállego → Raúl Gimeno | Logística Gállego | Raúl Gimeno |
| Cerámicas del Ebro → Transportes Moncayo → Transportes Huecha | Transportes Moncayo | Transportes Huecha |
| Factory → logistics operator → agency → owner-operator | The agency | The owner-operator |
If any flow in your company is unclear, put it in writing with each customer and partner: who contracts with whom and who issues the document. It is far easier to agree on it beforehand than to argue about it when a fine arrives.
Who issues the DeCA and who is liable for each field
Both parties are required to issue the control document, and the rules do not say which of them must generate it. It is issued by whoever the parties agree on, and it makes sense for the party that has the data first to do it. What the rules do split is liability. Since Orden TRM/282/2026 of 25 March corrected Article 7, it works like this:
| Field (Article 6) | Who is liable |
|---|---|
| a) Name or company name, tax ID and address of the contracting shipper | Contracting shipper |
| b) Name or company name and tax ID of the actual carrier | Contracting shipper |
| c) Place of origin and destination | Contracting shipper |
| d) Nature and weight of the goods | Contracting shipper |
| e) Special traffic permit, if any | Actual carrier |
| f) Date of transport | Actual carrier |
| g) Registration plates (tractor unit and semi-trailer for articulated vehicles) | Actual carrier |
| h) Remarks and reservations | Whoever adds them |
Note one detail: the shipper is also liable for the actual carrier's tax ID. If Logística Gállego issues the DeCA for Raúl Gimeno, the agency has to get Raúl's name and tax ID right, and Raúl has to check that the date and plates are his. Common mistakes in each field are covered in our guide to DeCA mandatory data fields.
Both are also liable if the document is not issued or is not on board. The contracting shipper is exempt from the second if it proves it issued the document, and with a DeCA that proof sits in the system itself, because the software records the creation date and time of each file. The fines behind each failure are explained in our article on fines for a missing control document.
What you should avoid is each party issuing its own DeCA for the same consignment. If the document the driver carries and the one the shipper keeps say different things, someone will have to explain which one counts. A single DeCA, issued by whoever was agreed and shared with the other party, causes far fewer problems.
Two copies of the DeCA and one year of retention
Article 8 of the Order requires two copies of the control document: one for the contracting shipper and one for the actual carrier, who carries it on board. With a DeCA nothing has to be printed twice. The document is a PDF with a unique URL, and what matters is that each party can access it.
Documents must be kept for at least one year for the Spanish Transport Inspectorate (Inspección de Transporte Terrestre). The Resolution of 5 June 2026 of the Directorate-General for Road and Rail Transport explains how this works for goods in section two, point 4:
- The contracting shipper and the actual carrier can each have their own repository to keep the files.
- If one of them generated the files, it is enough for the other to be able to download them for a year.
In the agency example, if Logística Gállego generates the DeCA in its software, Raúl Gimeno does not need other software to keep it: being able to download his PDFs for a year, or saving them himself, is enough. Watch out for one detail. The QR code URL can be deactivated seven calendar days after the service ends, so if that link is the owner-operator's only access, a week later he no longer has his copy. The agency should give him another download route that lasts the full year.
Several consignments from the same shipper in one DeCA
If the contracting shipper and the actual carrier are the same, the Resolution allows several consignments in a single DeCA (section six). For example, Cerámicas del Ebro loads three orders for Getafe, Pinto and Valdemoro onto the same Transportes Moncayo semi-trailer. One document can cover them, as long as each consignment shows its origin and destination and the nature and weight of its goods, and any other field that differs is shown for each consignment. The order in which consignments are listed does not set the delivery order. As soon as goods contracted by a different contracting shipper go on the truck, that consignment needs its own DeCA.
The copy for the subcontractor's driver
Before the service starts, the driver must receive a copy of the DeCA, on a phone or on paper, always with the QR code. When the contracting shipper is an agency and the driver works for another company, the practical way is to send the link or the PDF by WhatsApp or email. What matters is that the driver has it before setting off and knows how to show it at a roadside check. If anything changes during the journey, the amended or new PDF must also reach the driver, and handwritten corrections on a printed copy do not count.
If you are an owner-operator working mainly for agencies, there is a guide for your situation in our DeCA guide for owner-operators.
Common mistakes with the contracting shipper
- Listing the factory as shipper when an agency did the hiring. If there is an agency in between, the agency is the contracting shipper.
- Listing the agency as actual carrier. If it does not move the truck under its own authorisation, it is not.
- Leaving out the shipper's address. Field a) requires name or company name, tax ID and address. For the actual carrier, name and tax ID are enough.
- Mixing up the shipper's address and the loading point. The address in field a) belongs to the contracting shipper; the loading point goes in as the origin of the consignment. If the shipper is an agency in Zaragoza and the goods leave from Castellón, those are two different addresses.
- Carrying over yesterday's subcontractor. When you duplicate a DeCA, check that the actual carrier and plates are today's.
- Grouping consignments from different shippers. A DeCA with several consignments is only valid if the contracting shipper and the actual carrier are the same for all of them.
- Forgetting the other party. If you issue the document, the other party must be able to download it for a year.
LeyDeca works from both sides: you can issue as the actual carrier or as the contracting shipper, send the link to a subcontractor's driver and give the other party a download link that stays valid for a year. You will find each profile on the DeCA for carriers, agencies and shippers page.



